Murexin adhesives factory

Industrial

Mühlheim am Main, Frankfurt, Germany · June – August 2022

Explore
Location
Mühlheim am Main, Frankfurt, Germany
Client
Murexin Germany
Period
June – August 2022
Category
Industrial
PUR panels
100 mm · concealed fixing
Building height
13 m
Reported status
Completed and accepted

ABOUT THE PROJECT

Refurbishment of an existing building and installation of roof and wall cladding.

The work involved refurbishing an existing building and installing insulated roof and wall panels.

100 mm PUR wall panels with concealed fixings in RAL 9006/9002 were installed up to the building's 13 m height.

A 22 m lifting platform, a Cladboy lifting system and a 30 m Bobcat multifunctional handler were used.

Discuss a similar project

GALLERY

Services

From engineering to installation.

NEXT PROJECTBaumit dry mortar factoryWittenborn, Germany · November 2021 – April 2022